tools
Walk-in tub cost planner
Start from a dated manufacturer price reference or total your own written walk-in tub quote. The reference is Boca’s published installed range across its new tub configurations, with installation and removal included and an open upper amount. Quote mode uses only your entries and names any cost category still unpriced. These are the only two modes.

Review a published installed price reference or total your written tub quote. Results do not approve funding or confirm that equipment fits your home.
View Boca's published US range across new tub configurations, including installation and removal. It does not supply a local median or price changes to your room. Confirm service at your address.
Your entries stay in this page's memory. Reloading or resetting clears them.
How this tool works
Published-reference mode reads one manufacturer price record, checks its age against your planning date and shows the range with its open upper amount, included work and unconfirmed costs. It never calculates a local median, a feature surcharge or a deduction for any program. Quote mode adds the amounts you enter in cents, counts each of seven cost categories once, treats a blank as unknown and labels the subtotal incomplete until every category has an amount or a confirmed inclusion. The two modes never combine. There is no third mode. A regional, brand-comparison or feature-priced mode would need a verified source record, and none exists.
Read the source and price methods before using a result to plan a purchase.
Common questions
Can I use this without a written quote?
Yes. Choose the published tub price reference for an initial budget. It is one manufacturer’s range across its configurations. Confirm the model, installation scope and service at your address before you rely on it for a purchase.
How do I avoid counting installation twice?
In quote mode, select the inclusion checkbox when installation is included in the equipment package. The separate installation amount is removed and its input is disabled.
Is the upper amount a maximum?
No. The manufacturer prints a plus sign after the upper amount, and a project can cost more. The tool keeps that plus sign and lists the costs that still need confirmation.
For general planning. Confirm program rules with the administering agency or your plan, and installation details with a qualified professional. This site does not determine benefits or medical suitability.